๐Ÿ“… Today's Date 3rd August, 2026  |  Active Session 01h 03m
SNS-GB-1235   CERTIFICATION CODE: N/A
โ† Iraee - F
IGBC - Green Residential
Green Homes  |  Tenant Occupied Multi Storey
Base Case
Total COโ‚‚e
0 MT
Design Case
Total COโ‚‚e
0 MT
18
IGBC Points
Type Residential
Size 6294.196 sq. ft
Buildings 1
Location Pune
Start date May 28, 2026
End date May 28, 2029
โ‘  Membership
โ‘ก Registration
โ‘ข Feasibility
โ‘ฃ Pre-Certification
โ‘ค Site Compliance
โ‘ฅ Certification
Feasibility Assessment โ€” Generated ยท Score 18/100 ยท GOLD target
Reports
Overview
Credit-wise Breakdown
Score card summary
Recommendations
Conclusion

Project Summary

FieldValue
Project NameMY HOME Sanctuary
Project TypeMulti-dwelling Residential Mixed Use
LocationMamurdi, Pune
Prepared ForGoyal Properties
Report DateMarch 2026
Target CertificationGOLD
โœŽ Click any value to edit it directly.

Executive Summary

This feasibility study evaluates MY HOME Sanctuary against the IGBC Green Homes Version 3.0 rating system, checking the design against mandatory requirements and forecasting the credit points achievable across all six rating categories for this mixed-use, multi-dwelling residential development.

Certification Conclusion
Projected score: 18 / 100 points
Target certification: GOLD

Score card summary

18
pts achieved
Sustainable Design 4
Water Conservation 5
Energy Efficiency 1
Materials & Resources 3
Resident Health & Wellbeing 5
Innovation & Design 0
CategoryMax PointsAchieved
Sustainable Design204
Water Conservation235
Energy Efficiency201
Materials & Resources183
Resident Health & Wellbeing145
Innovation & Design50
Total10018

Credit-wise Score Breakdown

Sustainable Design โ€” 4/20
Water Conservation โ€” 5/23
Energy Efficiency โ€” 1/20
Materials & Resources โ€” 3/18
Resident Health & Wellbeing โ€” 5/14
Innovation & Design โ€” 0/5
Credit IDCredit DescriptionMaxStatusPts AchievedPts AnticipatedPts Rejected
MR1Local Building RegulationsReqCOMPLIANTReqโ€”โ€”
MR2Soil Erosion ControlReqCOMPLIANTReqโ€”โ€”
CR1Natural Topography & Vegetation4NO000
CR2Heat Island Effect, Non-roof & Roof4NO000
CR3Passive Architecture2NO000
CR4Universal Design2NO000
CR5Green Parking Facility4NO000
CR6Access to Amenities2YES200
CR7Basic Facilities for Construction Workforce1YES100
CR8Green Education & Awareness1YES100
Credit IDCredit DescriptionMaxStatusPts AchievedPts AnticipatedPts Rejected
MR1Water Efficient Plumbing FixturesReqCOMPLIANTReqโ€”โ€”
MR2Rainwater HarvestingReqCOMPLIANTReqโ€”โ€”
CR1Water Efficient Plumbing Fixtures6NO000
CR2Landscape Design3NO000
CR3Management of Irrigation System2NO000
CR4Recycle & Reuse of Waste water4YES400
CR5Water Quality1YES100
CR6Enhanced Rainwater Harvesting4NO000
CR7Water Metering3NO000
Credit IDCredit DescriptionMaxStatusPts AchievedPts AnticipatedPts Rejected
MR1HCFC Free EquipmentReqCOMPLIANTReqโ€”โ€”
MR2Minimum Energy PerformanceReqCOMPLIANTReqโ€”โ€”
CR1Enhanced Energy Performance10NO000
CR2Alternate Water Heating system3NO000
CR3On-site Renewable Energy - Common area Lighting4NO000
CR4Energy efficiency in common area equipment1YES100
CR5Integrated Energy Monitoring System2NO000
Credit IDCredit DescriptionMaxStatusPts AchievedPts AnticipatedPts Rejected
MR1Separation of House-hold WasteReqCOMPLIANTReqโ€”โ€”
CR1Green Procurement Policy1YES100
CR2Optimisation on Structural Design1NO000
CR3Certified Green Products5NO000
CR4Local Materials2NO000
CR5Eco friendly wood based materials2NO000
CR6Alternative Construction Material2NO000
CR7Handling of Construction & Demolition Waste2YES200
CR8Organic Waste treatment Post Occupancy3NO000
Credit IDCredit DescriptionMaxStatusPts AchievedPts AnticipatedPts Rejected
MR1Minimum Daylighting, 50%ReqCOMPLIANTReqโ€”โ€”
MR2Ventilation DesignReqCOMPLIANTReqโ€”โ€”
MR3No Smoking PolicyReqCOMPLIANTReqโ€”โ€”
CR1Enhanced Daylighting2NO000
CR2Enhanced Ventilation Design2NO000
CR3Cross Ventilation4NO000
CR4Connectivity to Exteriors2YES100
CR5Low VOC Materials, Paints & Adhesives2YES200
CR6Facility for Physical Wellbeing2YES200
Credit IDCredit DescriptionMaxStatusPts AchievedPts AnticipatedPts Rejected
CR1Innovation2NO000
CR2Exemplary Performance2NO000
CR3IGBC Accredited Professional1NO000

Recommendations

Priority actions to close the gap between the projected 18-point score and the GOLD target, ordered by category impact.

No recommendations added yet. Click "+ Add Recommendation" to add one.

Conclusion

Report Prepared By

FieldValue
Nameโ€”
Checked Byโ€”
Dateโ€”

Reports

Every time "Generate Report" is run, a snapshot of the feasibility data at that moment is saved here โ€” including any edits made since the last version โ€” so you always have a record of what changed and when.

No reports generated yet. Go to Conclusion and click "Generate Report" to create the first version.